Home What we do Abroad
Error
  • Error loading feed data.

Abroad

In developing countries -  Harambee - Together for the Development  realizes  co-operational  projects for development.  In a sustained development process , the primary responsibility is up to the authorities of the country,  both locally and centrally, which in turn must  conduct  measures that are  adequately in favour or  which enable endogenous pushes towards development. The foreign governmental or not governmental organization can give inputs and know-how, but the main action for development has to be absolutely the local sector. Otherwise the repeated dynamics of assistance and dependence on middle-long terms don’t produce benefits and morover frequently cause damage.
On the base of this evidence, Harambee- Together for the Development pursues to  the maximum involvement of the communities and the local authorities, in  and of every form and degree.

 

Project "School of Trade"

Project Name: "Institution and realization of a school of  trades for the vocational training of craftsmen in Kenya."

Specifications of the Project

Description of the Project

Axonometry School of Trade 

Project Status:
Project status: General Management for the Cooperation to the Development of the Italian Minister of Foreign Affairs, resolution n 151 from 2/09/2008 of the  Executive Council for the cooperation to the development, approved il co-funding to the project " Institution and realization of a school of  trades for the vocational training of craftsmen in Kenya" planed by Harambee and promoted by the Province of Cuneo.

 

Project: "Water for the life"

Project Name: "Water for the Life: an Aqueductc for Kalalu"

Description of the Project

Water Distribution Graph

DescriptionProject flyer
The specific aim of project is to supply drinking water to three facilities: the Kalalu Secondary School, attended by 240 pupils, other than teachers and no teaching staff; the maternity garrison and the medical dispensary, already equipped in order to guarantee 30 examinations and so many medications per day.
The project focus on the building of a brick reservoir, 25.000 litres capacity.; the excavation works and the laying of polythene water pipes; the connection of water distribution systems inn the facilities and the laying of water meters.

Project Status: Settled
The aqueduct was consigned to local competent authority, on 12th January 2009.

Last Updated ( Monday, 18 January 2010 17:35 )

Donation
Your contribution will support our projects in developing countries
World News
HARAMBEE - Insieme per lo sviluppo - Viale Mazzini, 22 - 12032 Barge (CN) - info@harambee-onlus.it